Archibald & Watt Rehabilitation/Mill and Fill, Including Archibald Underpass
Interesting bid opportunity on the City web site for a rehabilitation project on Archibald Street including the Archibald Underpass and a connection to the NPG.
http://winnipeg.ca/MatMgt/FolderContents.asp?FOLDER_NAME=999-2015&YEAR=2...
This sure would be a big benefit for people in St. B and those attempting to connect from the NPG.
Here is an excerpt from the RFP.
D3.4 Pedestrian and Cycling Facilities (a) Extension of the Northeast Pioneer’s pathway south to the Archibald Street Underpass is planned in the near future, thus a preliminary design study is needed to examine the extension of this pathway, and connection to a widened sidewalk under the underpass. (b) Detailed design will be limited to provision of the pathway in the vicinity of the underpass, including ramps, stairs, or other similar structures as may be required to transition the sidewalk from the underpass up to the future location of the proposed pathway extension