MAIN POWER SHUTDOWN - Mar22 || 303C230310-01 UMSU Arc Flash Study & Panel Replacements
On behalf of Project Manager, Muriel Torchia Shyjak please see shutdown request for UMSU Univ Centre: \ad.umanitoba.ca\ppem\Loclapps\A&E\Buildings\303 UMSU UCntr\4 Active\C230310-01 Arc Flash Study and Replace Distribution Panels\06-Const\03-ShutDowns\02-SD\08-ELEC_SD1 Shutdown 1-Mar22_2026\1-UMSU-MAIN PWR Shutdown 1-Mar22.pdffile://ad.umanitoba.ca/ppem/Loclapps/A&E/Buildings/303%20UMSU%20UCntr/4%20Active/C230310-01%20Arc%20Flash%20Study%20and%20Replace%20Distribution%20Panels/06-Const/03-ShutDowns/02-SD/08-ELEC_SD1%20Shutdown%201-Mar22_2026/1-UMSU-MAIN%20PWR%20Shutdown%201-Mar22.pdf
Start End Details Date(s): Mar.22 Mar.22 SUNDAY Times: 7am 11am Scope: (description of shutdown work with room #'s)
Shutdown SD1 to investigate for future retrofits Workorder Required (indicate shop(s):
ELEC-FA, ELEC, ENG/CTRL Building Notification (Yes or No):
YES Notification:
On March 22/26 from 7am -11am all power, ventilation and fire alarms will be off to many areas in the building. No occupancy will be allowed during this time and building will be closed and secured by Security Services. Please power down any equipment that may be affected by this power outage. If you have any questions or concerns regarding this shutdown please contact UM Project Manager Muriel Torchia Shyjak at 431-336-3797, muriel.torchiashyjak@umanitoba.camailto:muriel.torchiashyjak@umanitoba.ca
Thank you,
Traci Friesen, BES Project Administrator l Architectural & Engineering Services University of Manitoba 118-89 Freedman Cres. C: 431-374-8140 Upcoming Vacation: Mar 6, 13 & Mar 26-Apr6
participants (1)
-
Traci Friesen