On behalf of Project Manager, Muriel Torchia Shyjak please see shutdown request for UMSU Univ Centre:
\\ad.umanitoba.ca\ppem\loclapps\A&E\Buildings\303 UMSU UCntr\4 Active\C230310-01 Arc Flash Study and Replace Distribution Panels\06-Const\03-ShutDowns\02-SD\09-ELEC-SD2 Shutdown2-Jun21_2026\ELEC_SD2 Shutdown 2_Jun21_2026.pdf<file://ad.umanitoba.ca/ppem/loclapps/A&E/Buildings/303%20UMSU%20UCntr/4%20Active/C230310-01%20Arc%20Flash%20Study%20and%20Replace%20Distribution%20Panels/06-Const/03-ShutDowns/02-SD/09-ELEC-SD2%20Shutdown2-Jun21_2026/ELEC_SD2%20Shutdown%202_Jun21_2026.pdf>
Start End Details
Date(s):
JUN.21
Jun.21
Times:
6AM
6PM
Scope:
(description of shutdown work with room #'s)
Main power shutdown to remove & replace SD2 distribution panel.
Workorder Required (indicate shop(s):
ELEC-FA, ELEC, ENG/CTRL, REFRIG
Building Notification
(Yes or No):
YES
Notification:
On Sunday, June 21/26 from 6am -6pm all power, ventilation and fire alarms will be off to many areas in the building. No occupancy will be allowed during this time and building will be closed and secured by Security Services. Please power down any equipment that may be affected by this power outage.
If you have any questions or concerns regarding this shutdown please contact UM Project Manager Muriel Torchia Shyjak at 431-336-3797, muriel.torchiashyjak(a)umanitoba.ca<mailto:muriel.torchiashyjak@umanitoba.ca>
Traci Friesen, BES
Project Administrator || Architectural & Engineering Services
University of Manitoba 118-89 Freedman Cres.
C: 431-374-8140
Upcoming Vacation: Mar 26-Apr6